Skip to main content

1. Core Service Pillars (Excluding Fire & Safety)

Replace the loose list of 15+ mixed bullets with four defined engineering service offerings:

  • Power Systems Installation & Commissioning:

    • Industrial AVRs, Servo Voltage Stabilizers (SAKO, Mingch), and high-capacity Online UPS systems.

    • UPS battery bank integration, rack mounting, and DC cabling.

  • Earthing & Lightning Protection Systems (LPS):

    • ESE arrester erection, down-conductor routing, Earth Pit boring, and Backfill Compound (BFC) treatment.

    • Earth resistance testing (<1 Ω< 1\,\Omega<1Ω target compliance).

  • Industrial Switchgear & Substation Assistance:

    • Circuit breaker retrofitting (ACB, MCCB, MCB - ABB, Schneider, Legrand).

    • Distribution board cabling, busbar alignment, and load balancing.

  • Power Quality & Electrical Consultation:

    • Single-Line Diagram (SLD) preparation, Bill of Quantities (BOQ) estimation, and equipment sizing based on plant load profile.

2. Clear SLA & Maintenance Service Models

Turn the existing paragraph into a clean comparison grid for procurement managers:

Service Tier Coverage Scope Spare Parts & Replacements Typical Response Time
Warranty Support Factory defects, initial commissioning calibration Included under official warranty Scheduled priority
Annual Maintenance Contract (AMC) Scheduled quarterly inspections, thermal checks, preventive cleaning, emergency breakdown calls Optional (client-supplied or discounted catalog rate) Guaranteed SLA window (e.g., within 4–8 hours)
On-Demand Callout One-time troubleshooting, site inspection, fault diagnosis Billed separately based on BOQ Based on engineer availability

3. Standards & Engineering Testing

State verified electrical standards instead of mixing in fire brigade/garment audit certifications:

  • Testing Equipment & Tests: Insulation resistance testing (Megger), earth ground resistance testing, harmonic & voltage fluctuation logging.

  • Compliance Standards: BNBC (Bangladesh National Building Code), IEC 60364 / IEC 60947, and IEEE earthing guidelines.

4. Conversion & User Journey

  • Avoid generic call-back spam prompts.

  • Add a low-friction action on each service card: "Inquire for Service / Scope" or "Book an Earth Resistance / Power Audit".

  • Provide a direct link to download the ICL Electrical Engineering Capabilities Profile (PDF).

Would you like to build this layout directly as a custom Tailwind/Blade template for your Laravel/Bagisto store, or design an Elementor layout for the WordPress site first?